Swaney Construction is a family run building contractor based in Maulden, Bedfordshire, specialising in insurance funded repairs and working as a Principal Remedial Works Contractor for NHBC Buildmark Policy Claims.

Established in 1993, we have built a reputation for delivering high-quality professional services to our customers and maintain a very high level of customer satisfaction.  Our remedial contracts require us to maintain a minimum MPS score of 8/10 and we proudly exceed this.

We cover areas throughout Bedfordshire, Buckinghamshire, Hertfordshire, Cambridgeshire and Northampton, but will also extended areas as far as North and Central London, Essex, Oxfordshire and The Fens.

As a building contractor we specialise in projects up to £250,000, but with our management expertise and skilled craftsmen we have very successfully taken on much larger projects, up to £850,000, and still deliver high quality work.


Why choose Swaney Construction?

  Comprehensive service from planning stage through to completion

  Over 25 years experience in several fields

  Experts in time management

  Dedicated project team

  Excellent safety records


Why not get in touch for your free, no-obligation consultation today.


Our Projects


Colmworth Swimming Pool MK44 - completed March 2019.

This timber swimming pool house suffered fire damage following an electrical fault. 

Due to the unique design of the pool house, this could not be purchased as a factory made item from a cabin manufacturer.  We therefore designed the new structure, and our in house carpentry team rebuilt by building a timber frame from scratch and shiplap cladding.  The pool house was insulated and the timber was treated and stained and finished with a felt roof.  The swimming pool was repaired and relined, and the internal pool surround was rebuilt.

The pool house electrics also needed to be redesigned to be meet new 2019 regulations, but to also reinstate as per the original installation of a shower, dehumidifier and other accessories, our team worked hard to overcome all limitations and offer a full solution for our customer.

The homeowner chose to privately fund some upgrades, such as the installation of an Air Source Heat Pump and Bi-fold doors and the results are beautiful.


Broom, Biggleswade SG18 - completed December 2018.

This demolish and rebuild project was completed in 2018.

The contemporary property was managed by Swaney Construction from design and planning stage, demolition, service alterations, groundwork internal fit out, landscaping and completion.

The 5 double bedroom property was finished to a high standard including, three en-suite shower rooms, a feature gallery landing, storey windows and a log burner.


Stratford High Street, London E15

The property had suffered from a long term slow leak, from a cracked waste pipe and water was escaping every time the basin and shower were in use.

We were employed to investigate the source of the leak and repair the surrounding damage.

Following the leak trace and repair, the damage had already extended throughout the Hallway, Bathroom, Bedroom and En-suite, and Lounge/Kitchen area, as well as damage to the apartment below.